(1) The Ministry of Transport has released a revised version of the "Coastal Port Water Engineering Construction Engineering Quota" (JTS/T 276—1—2019), which will take effect on October 1, 2025. The revised standard, referred to as the "Quota Revision," has made changes to various sections, including foundation engineering and precast installation engineering. Specifically, the following quotas have been abolished:
(2) - Water-based pile head treatment steel reinforced concrete pile cutting quotas (20373-20375) - Water-based pile head treatment steel reinforced concrete pipe pile cutting quotas (20379-20383) - Land-based pile head treatment cutting quotas (20563-20566) - Artificial hole drilling quotas (20574-20590) - Land-based deep layer concrete mixing pile quotas (20910-20911) - Hollow board quotas (30070-30071) - Water-based installation of hollow boards quotas (30159-30163) - Land-based installation of hollow boards quotas (30205-30206) - Pre-fabricated box quotas (30222-30233) - Round tube pre-fabrication quotas (30258) - Scaffold quotas (60167-60170, 60172-60177)
(3) The revised standard is managed and interpreted by the Maritime Bureau of the Ministry of Transport, and any specific usage questions can be addressed by the main editing unit, the Transport Water Engineering Cost Quota Center. The revised text is available for download on the Ministry of Transport's government website in the "Waterway Engineering Industry Standard" section.