This is a machine-generated summary.
(1) The Inner Mongolia Civil Aviation Airport Construction Investment Group Co., Ltd. received approval for the Water Conservation Plan for the General Airport Project in Korla Right Middle Banner on December 25, 2024. The plan involves constructing an airport in the Korla Right Middle Banner of the Xing'an League in Inner Mongolia, with a total land area of 27.92 hectares and a total investment of 65.8 million yuan. The project aims to be completed within 6 months, starting in April 2025 and finishing in September 2025.
(2) The water conservation plan has been approved, with the following conditions:
(3) 1. The water conservation area is 27.92 hectares, and the water conservation measures will be implemented in accordance with the standards for the Northeast Black Soil Region. 2. The water conservation targets are: water loss control rate of 97%, soil loss control ratio of 1.0, mud protection rate of 97%, topsoil protection rate of 98%, forest and grass restoration rate of 97%, and forest and grass coverage rate of 27%. 3. The water conservation division and division measures are approved. 4. The water conservation compensation fee of 47.464 yuan has been approved.
(4) To ensure the successful implementation of the water conservation plan, the following requirements must be met:
(5) 1. The production and construction unit must strictly implement the approved water conservation plan, including the initial design and subsequent design. 2. The unit must strictly implement the water conservation measures, including restricting construction activities within the designated area, preventing damage to vegetation, and controlling water loss. 3. The unit must conduct regular monitoring and submit quarterly and annual reports to the authorities. 4. The unit must implement water conservation inspection and ensure the quality and progress of the water conservation project. 5. The unit must pay the water conservation compensation fee in a timely manner.
(6) If any changes are made to the project location, scale, or water conservation measures, a revised water conservation plan must be submitted to the authorities for approval. The unit is responsible for conducting self-inspection of the water conservation facilities before the project is put into use. The self-inspection report must be submitted to the authorities within 3 months of the inspection. If the inspection is not passed, the project cannot be put into use.
(7) This permit is valid for 3 years from the date of approval. If the project has not started construction within the permit period, the unit must apply for a re-audit within 30 working days of the permit expiration date. If the project is not re-audited, the permit will automatically expire.