内蒙古自治区生态环境厅关于内蒙古上海庙电厂4×1000MW发电项目500kV升压站建设项目环境影响报告书的批复

English title (machine-translated)
The Inner Mongolia Autonomous Region Environmental Protection Department's Approval of the Environmental Impact Report for the 500kV Substation Construction Project of the 4 × 1000MW Shanghai Temple Power Plant in Inner Mongolia.
Published
2025-03-13
Type
Law, regulation or policy
Subtype
政策文件库
Level
内蒙古自治区 (Provincial-level units)
Length
701 characters, 15 paragraphs
Department
内蒙古自治区生态环境厅
Source
自治区生态环境厅
Law ID
11150000MB1945778L/2025-01274
Law Status
有效

Summary

(1)  The National Power Grid Corporation of China's Inner Mongolia Shanghai Miao Energy Company submitted an Environmental Impact Report for the 4x1000MW Power Generation Project at the Inner Mongolia Shanghai Miao Power Plant, specifically for the 500kV Substation Construction Project. After reviewing the report, the Inner Mongolia Autonomous Region Environmental Protection Bureau has made the following decision:

(2)  The project has been completed and put into operation since August 2021, and the Inner Mongolia Autonomous Region Environmental Protection Bureau has issued a decision not to impose administrative penalties on the project (Inner Mongolia Autonomous Region Environmental Protection Bureau [2025] No. 5). Based on the original Environmental Protection Bureau's Opinion on the Application of Legal Rules to the Unapproved Construction (Environmental Protection Bureau [2018] No. 31), from an environmental and policy perspective, the project meets the requirements of the relevant documents, and the Bureau agrees in principle to the environmental impact assessment approval of the project.

(3)  During the project's operation period, the following work should be done:

(4)  (1) Strictly implement the ecological environmental protection measures during the operation period, and do a good job in the ecological protection of the surrounding areas.

(5)  (2) Seriously implement the measures and methods proposed in the report for controlling and improving the impact of the project on the surrounding environment in terms of frequency field and frequency magnetic field, and the monitoring values should meet the requirements of the Electromagnetic Environment Control Limits (GB8702-2014).

(6)  (3) During the operation period, the substation's living wastewater should be treated by the existing underground integrated wastewater treatment facilities within the plant. All waste transformer oil and waste batteries generated during equipment maintenance should be recycled. If they cannot be recycled entirely, they should be stored separately and sent to units with the corresponding hazardous waste business qualifications for disposal.

(7)  (4) The noise values and noise prevention measures during the operation period should meet the requirements proposed in the report, and the monitoring values should meet the national evaluation standard limits.

(8)  The construction unit should complete the post-construction environmental protection acceptance in accordance with the prescribed procedures by March 12, 2025.

Original

(1)  国电电力双维内蒙古上海庙能源有限公司:

(2)  你公司报送的《内蒙古上海庙电厂4×1000MW发电项目500kV升压站建设项目环境影响报告书》(以下简称《报告书》)收悉。经研究,批复如下:

(3)  一、项目建设基本情况

(4)  已建一座500kV升压站,建设4×1140MVA主变,配套4×80MVA高厂变、2×80MVA启备变,1组3台并联式单相油浸式高抗(单台额定容量60Mvar),500kV出线3回。

(5)  本项目建设地点位于内蒙古自治区鄂尔多斯市鄂托克前旗境内。

(6)  二、总体意见

(7)  该项目已于2021年8月建成投运,内蒙古自治区生态环境厅于2025年1月26日出具不予行政处罚决定书(内环不罚〔2025〕5号)。根据原环境保护部《关于建设项目“未批先建”违法行为法律适用问题的意见》(环政法函〔2018〕31号),从环境保护及政策角度分析,该项目符合相关文件要求,我厅原则同意该项目的环境影响评价批复。

(8)  三、项目运行期间应做好的工作

(9)  (一)严格落实项目运营期生态环境保护措施,做好周边区域的生态保护工作。

(10)  (二)认真落实《报告书》中提出的控制和改善工频电场、工频磁场对周边环境影响的措施和方法,监测值应符合《电磁环境控制限值》(GB8702-2014)要求。

(11)  (三)运营期升压站生活污水依托厂内现有地埋式一体化污水处理设施处理。对设备维修过程中产生的废变压器油、废蓄电池等应全部回收,如不能全部回收,必须单独存放,集中送交有相应危险废物经营许可资质的单位处置。

(12)  (四)项目运行期的噪声值及防噪措施应满足《报告书》中提出的要求,监测值应符合国家评价标准限值要求。

(13)  四、建设单位应按规定程序完成竣工环境保护验收。

(14)  内蒙古自治区生态环境厅

(15)  2025年3月12日