Summary
This is a machine-generated summary.
(1) The Inner Mongolia Power Group (Group) Co., Ltd. Shuijiawan Power Supply Branch received and reviewed the Environmental Impact Report for the 8000-ton Electronic Grade Silane Project of Inner Mongolia Jiayang Technology Co., Ltd. (hereinafter referred to as the "Report"). After careful consideration, the following approval is given:
(2) 1. Project Construction Overview
(3) (1) A new 220kV substation-Shuijiawan 110kV user station 110kV transmission line will be built, with a total length of approximately 4.56km. This includes 3.8km of double-circuit single-side overhead lines, 0.43km of single-circuit overhead lines, 0.33km of cables, and 27 foundation pits.
(4) (2) A new 220kV substation-Shuijiawan 110kV user station 110kV transmission line will be built, with a total length of approximately 16.4km. This includes 14.3km of double-circuit overhead lines, 1.7km of single-circuit overhead lines, 0.4km of cables, and 93 foundation pits. The project will be located in the Qingshui Banner, Ordos City, Inner Mongolia Autonomous Region.
(5) 2. Overall Opinion
(6) After strictly implementing the environmental protection measures outlined in the Report, the project's negative impacts on the environment and potential environmental risks are within a controllable range. From an environmental protection perspective, the Department of Ecology and Environment of Inner Mongolia Autonomous Region generally agrees that the project can be built according to the nature, scale, location, and environmental protection measures listed in the Report.
(7) 3. Work to be Done During Construction and Operation
(8) (1) Strictly implement environmental protection measures during the construction and operation periods, and complete ecological protection and restoration work. During construction, strictly control the construction area, reasonably layout, and minimize land occupation and vegetation destruction.
(9) (2) Seriously implement the measures and methods outlined in the Report to control and improve the impact of power frequency electromagnetic fields on the surrounding environment. Monitoring values should meet the requirements of GB8702-2014.
(10) (3) Noise values and noise prevention measures during construction and operation should meet the requirements outlined in the Report. Monitoring values should meet the national evaluation standard limit values.
(11) (4) If the project's nature, scale, location, or environmental protection and pollution prevention measures undergo significant changes after the Report is approved, a new approval should be submitted in accordance with the requirements.
(12) 4. The construction unit should complete the post-construction environmental protection acceptance in accordance with the prescribed procedures before the project can be formally put into operation.
(13) 5. The Ordos Municipal Bureau of Ecology and Environment is entrusted to supervise and inspect the project during the construction period.